Ian Mikardo High School also commissioned Setter Play to design and install an outdoor teaching cabin, that they could used for time-outs and small group lessons. This was a slight departure for us, but using our familiarity with other aspects of building we put together a design and quote which was accepted – and both Setter and the school are very happy with how it turned out!
The cabin was fully insulated, and has electricity provision for power sockets, overhead lights, and an AC unit.
The exterior of the cabin has large planting beds to help it blend in to it’s surroundings, and complement the muted, natural look.
The head at Ian Mikardo is super happy with his new play area, and we’re very proud of a job well done!